“Sistema de Entrenamiento de Mision de los Aviones Casa C-212-CE”. Ref. No. MARINA2006-C05-55875. Secretaria de Marina Armada de Mexico. Project in progress started in January 2008 . Project cost $ 5,341,000.00.
“Sistema robotizado para el diagnostico y monitoreo automatico de las consideraciones operativas en lineas de transmision de 230 y 400 kW”. Ref. No. CFE-2006-C05-48325. Comision Federal de Electricidad. Responsible: Dr. Leopoldo Altamirano Robles. Project in progress started in November 2008. Project cost $ 3,490.000.00.
“Sistema de seguimiento de la confiabilidad del equipamiento de distribucion.” Ref. No. CFE-2006-C05-48087. Comision Federal de Electricidad. Responsible: Dr. Leopoldo Altamirano Robles. Project in progress started in January 2007 Project cost $ 7,132.556.00.
“Conjunto de Modulos para la elaboracion de un RUP”, (4 contratos). SITMA (Servicios Inmobiliarios y Computacion S.A. De C.V.). Responsible: Dr. Leopoldo Altamirano Robles. Project in progress started in Octubre 2006. Project cost $ 2,466.652.00. End 2009.
Responsible of the project “Naval Warhead (Ojiva Naval)” SEMAR-CONACYT 2006. Secretaria de Marina Armada de Mexico. Project in progress started in March 2006 (s. certification sheet). Project cost $ 5,172.610.00.
Responsible of the project “Satellite Antenna in KU Band (Antena Satelital en Banda KU)” SEMAR-CONACYT 2006. Secretaria de Marina Armada de Mexico. Project in progress started in March 2006. Proyect cost $ 2,000.200.00.
Finished
“Morbidity Dynamics and the Disablement Process in Fruit Flies”. Ref. No. K011258-01. University of California, Davis, USA and Ecosur. Responsible: Dr. Leopoldo Altamirano Robles. Project started in January 2006. Project cost $ 30,000.00 US. Ended November 2008. Patent to be submitted .
Responsible of the project: “System for Helicopter naval landing” (Sistema de Anaveaje). SEMAR-CONACYT 2004. Secretaria de Marina Armada de Mexico. Project started in May 2004. Project cost $ 6,906.200.00. Project concluded.
Responsible of the project: “Naval Misil”. SEMAR-CONACYT 2004. Project in progress started in May 2004. Project cost $ 16,691.833.75. Project concluded.
Responsible of the project: “System for Observation using High Resolution CCD Cameras Ver. 2.0”. SEMAR-CONACYT 2002. Project started in April 2003. Project cost $ 18,900.000.00. Project installed and in test phase.
Responsible of the project: “Medical Image Network” (Modernizacion del Equipo Electromedico en los Establecimientos de Sanidad de la Armada de Mexico) SEMAR-CONACYT 2002. Project started in April 2003. Project cost $ 6,943.885.00. Project finished.
Responsible of the project: “Electronics Systems for Monitoring Lifetime Behavior in Medflies”, System developed for the University of California Davis (UCD) and ECOSUR, UC MEXUS program, 2003. Project cost US $ 8.000.00. Project finished.
Co-Responsible of the project: “System for Observation using High Resolution CCD Cameras Ver. 1.5”. System developed for the Mexican Navy. Project executed 2002-2004. Project cost $ 6,500.000.00. Project finished.
Responsible of the project: “System for Observation using High Resolution CCD Cameras Ver. 1.0”. System developed for the Mexican Navy. February 2000 to January 2001. Project cost $ 8,500.000.00. Project finished.
Responsible of the Project:: "Medfly Egg Counting Automatic System". Contractor: Colegio de la Frontera Sur (ECOSUR). Project cost: $ 300,000. In collaboration with Dr. M. Arias INAOE, 1999-2000. Project finished.
Responsible of the Project: “System for the sub-millimeter bolt location in car bodywork using digital image analysis”. System developed for the Volkswagen Automotive Plant from 1998 to 2000.. Project finished.